Wedding florist timeline: a template to adapt

Start from the wedding date and work backwards to know what to decide, order and prepare at each stage.
6 min read
Published by FlolyaTo build a wedding timeline from the florist’s side, start from the event date and work backwards: proposal approval, final numbers, orders, production, installation, then teardown. Each stage has a deadline and a deliverable, such as “table count confirmed” or “order sent to the wholesaler”.
The timings below are a working assumption for a wedding of about 80 guests with ceremony and reception. They are not industry standards: adjust them to your studio, your suppliers and the size of the project. The point is to have a list in which nothing depends on memory.
1. Why start from the date and work backwards
A standard schedule moves forward from the first contact. A reverse timeline does the opposite: it fixes the wedding day, then calculates the latest possible date for each decision. That exposes the deadlines that are costly to miss: a table count still unclear three weeks out, a variety ordered too late, a van not booked.
For each stage, note three things: what must be decided or received, who is responsible (you, a client, a supplier) and what happens if the deadline slips. The last point helps you choose which dates are firm and which are flexible.
2. A template from 6 months out to the day after
In this example every deadline is an assumption. If a wedding is booked only three months ahead, compress the first rows: the stages stay the same, only the gaps between them change.
| Deadline | To do | Deliverable |
|---|---|---|
| 6 months out | First conversation, quote, signature, deposit | Date blocked in your calendar |
| 4 months out | Venue visit, detailed brief, floral proposal | Scope and palette approved by the couple |
| 8 weeks out | Last date to change the scope without affecting orders | Number of tables, spaces and pieces confirmed in writing |
| 6 weeks out | Recipes locked, needs list, delicate or special-order varieties | Special orders sent |
| 3 weeks out | Containers, rentals, team and vehicle | Bookings confirmed |
| 10 days out | Setup and pickup times, on-site contact, access | Logistics sheet sent to the venue and the client |
| 7 days out | Final purchase list, fresh stem order | Supplier purchase order |
| 3 to 2 days out | Receiving, sorting, cleaning and hydrating flowers | Stock checked and stored |
| 2 to 1 days out | Making durable pieces, then bouquet and boutonnieres | Pieces packed and loaded |
| Wedding day | Installation, final check, photos, handing over personal pieces | Venue ready at the agreed time |
| Day after | Teardown, return of rentals, cleaning | Equipment returned, balance invoice sent |
3. Lock what the client must confirm
The most useful date in the timeline is the one where the scope becomes final. Before it, a change is a conversation. After it, it is an order to redo, a price to recalculate, sometimes a variety no longer available. Tell the client this date at signature, for example in the quote or in the message that accompanies the proposal.
- Number of tables and guests, or at least a range to confirm by the set date.
- Spaces to dress: ceremony, drinks reception, dinner, entrance, staircase.
- Personal pieces: bouquet, boutonnieres, flower crowns or children’s pieces.
- Who is present at setup time and who collects pieces after dinner.
Price a complete wedding before fixing the calendar
4. Align purchasing and production with delivery dates
Purchasing follows two rhythms: items ordered in advance (delicate varieties, containers, equipment) and fresh stems that arrive a few days before. Ask your wholesaler or grower for their order and delivery days, then put them in the timeline before anything else: you cannot order on a Tuesday if the supplier delivers on Thursday.
Start from installation day
Count backwards the time needed for loading, production and conditioning the flowers. That is your latest realistic delivery date.
Add the supplier’s order days
If the supplier needs an order 48 hours before delivery, that is the deadline that counts, not the day you would like to order.
Combine when several events overlap
When two weddings fall in the same week, check whether one order can cover both and what that changes for receiving and storage.
Leave a margin for surprises
Keep a buffer day before the wedding for a late delivery or an unavailable variety. Its length depends on your suppliers and the season.
5. The event week, hour by hour
From three days out, the timeline works better as a schedule of people: who does what, at what time, with which vehicle. The last two days hold the most risk: flowers are worked, moved and stored between times that others have set.
- Departure time from the studio, travel included, with a margin for access.
- Time the venue is available, and who opens the door.
- Pieces to install first (arch, ceremony decor) and those to place last (table centrepieces).
- Contact for the couple or best man for personal pieces, with the handover time.
- Pickup time the next day if teardown is planned, and who returns the containers.
Send a one-page sheet to the venue and the client ten days before: times, access, number of team members, electricity or water needs, setup duration. It avoids most last-minute questions.
6. Do not forget the day after
Teardown, cleaning and returning rentals are work to schedule like the rest. If you collect equipment the next day, block the morning and the person. Then invoice the balance based on the final quote and the changes accepted along the way.
Also remember that for a contract concluded at a distance with a consumer in France, a 14-day withdrawal right may apply, with exceptions including services fully performed before the end of the period. Check how this fits with your signature date and production schedule.
7. Adapt the template to your studio
Keep the same rows from one wedding to the next and change only the dates. A 200-guest wedding probably needs more production time and more hands for installation, but the order of the stages is identical. After each event, note one thing to move or shorten in your template.
In Flolya, an event file brings together the client, date, venue and budget. You can add tasks, find the event in the calendar and reuse an event template to start from your usual method.
Organise your events, tasks and calendar in Flolya
Frequently asked questions
- What is a reverse timeline for a florist?
- A schedule built from the event date. For each stage (approval, ordering, production, installation, teardown) it gives the deadline, the person responsible and the expected deliverable.
- When should I start preparing a wedding?
- It depends on the size of the project and your suppliers. In this article’s example the first conversation takes place six months out. If a wedding is booked later, keep the same stages and shorten the gaps.
- When should the client confirm the number of tables?
- Set a date before your orders, for example eight weeks out in our example, and write it in the quote. After that, a change may require a new price.
- Do I need a separate timeline for every event?
- Keep one template, then adapt the dates to each wedding. The stages are almost always the same, only the timings and the number of people change.
- What if two weddings fall in the same week?
- Overlay both timelines and spot the dates that collide: orders, receiving, production and vehicle. Combine what can be combined and separate the installation teams.